2 laying cables, Laying cables, Section 7.2.1 – SMA TCS 500-SC User Manual

Page 18

Advertising
background image

7 Electrical Connection

SMA Solar Technology AG

18

TCS-IT-IEN103610

Installation Manual

7.2 Laying cables

7.2.1 Running Cables between the Low-Voltage Switchgear and

the Inverter

☐ The AC cables are 3-phase cables.
☐ Between the low-voltage switchgear and the inverter there are three separate cable runs for the

AC cables, e. g. cable channels.

☐ The spacing between the cable runs must be at least twice the diameter of an AC cable.

Figure 6: Arrangement of AC cables with three cables per line conductor (example).

• Run the cables as described.

Maintain cable clearances

Run an L1, L2 and L3 line conductor in each cable run. The spacing between the cable pairs
must be at least twice the diameter of a cable. This prevents current imbalances.

L2

L1 L3

L2

L1

L3

L2

L1 L3

1d

>2d

--

>2d

--

Advertising
This manual is related to the following products: