3 connecting the communication cable, Connecting the communication cable, Connection procedure – SMA AUTOMATIC SWITCH BOX L User Manual
Page 39

SMA Solar Technology AG
Electrical Connection
Installation Guide
AS-BoxL-IEN084410
39
5.9.3 Connecting the communication cable
Connection procedure
Plug the communication cable (black) for the Sunny Backup master into the "ComSyncIn" socket on
the circuit board inside the Automatic Switch Box. Leave the termination resistor plugged into the
"ComSyncOut" socket.
☑ The communication cable is connected.
ComSyncIn
ComSyncIn
ComSyncOut
ComSyncOut
Sl v2/L3
BackupVtgCur
Sl v2/L3
BackupVtgCur
Sl v1/L2
BackupVtgCur
Sl v1/L2
BackupVtgCur
Mstr/L1
BackupVtgCur
Mstr/L1
BackupVtgCur
F6 Generator
L2
L1
L3
X3/ Backup Loads
N N PE
F5 Backup Loads
L2
L1
L3
X4/ PV System
L1 L2 L3 N PE
X5/ PV Meter
L1 L2 L3 N PE
Generator
N PE
X2/ SBU5000
L1 L2 L3 N N N PE PE PE
X1/ Load Meter
L1 L2 L3 N N PE
IN L1 PE
X7