Operation – Exmark Ultra Vac QDS 00 & Higher User Manual

Page 16

Advertising
background image

Operation

16. Belt Installation:

For Small Decks:

A. Slip the belt over the impeller sheave on the

blower.

Note: It may be easier to install the belt if
the belt guide is temporarily shifted to one
side or temporarily removed. Either loosen
or remove both nuts on the top and bottom
of the belt guide. Once the belt is installed
on the impeller sheave, reinstall the belt guide
and tighten all hardware.

Figure 15

1.

Nut

2.

Belt guide

B. Pull the spring loaded idler release handle

back and install the belt in the upper groove
of the top spindle sheave. The belt should be
routed as shown in Figure 16.

Figure 16

Small Decks — View from Top of Blower

1.

Spring loaded idler

4.

Belt guide

2.

Impeller sheave

5.

Deck sheave

3.

Fixed idler

For Large Decks:

Pull the spring loaded idler back and slip the belt
over the top deck sheave.

Figure 17

Large Decks — View from Top of Blower

1.

Impeller sheave

3.

Spring loaded idler

2.

Deck sheave

17. Position the belt cover at an angle and slide it

under the mower frame (see Figure 18).

Figure 18

1.

Blower

3.

Mower frame

2.

Belt cover

18. Push down on the back of the cover and slide it

backwards under the blower.

19. Slide the belt cover forward until it is seated under

both lips on the deck.

16

Advertising
This manual is related to the following products: