Operation – Exmark Ultra Vac QDS 00 & Higher User Manual

Page 17

Advertising
background image

Operation

Figure 19

1.

Blower

3.

Deck lip

2.

Belt cover

20. Install the knob and its hardware.

21. Slip the upper and the lower tubes together.

22. Insert the upper tube into the hopper seal –

push in then pull out so that the seal is extended
outward.

23. Align the dimple on the upper tube with the end

of hopper seal and center between the two screws
as shown in Figure 20.

Figure 20

1.

Dimple

24. Set the deck in lowest cutting position.

25. Slide the lower tube onto the blower and attach

the latches. (Make sure that the upper tube does
not move out of alignment).

26. If the lower tube is replaced, drill three 7/32 inch

holes in the lower tube using the upper tube holes
as reference. See Figure 21.

27. Remove the tubes from unit and assemble the

upper and the lower tubes using three #10-24
x 3/4 inch hex washer head screws, three #10

washers, and three #10-24 nyloc nuts. The screw
head should be installed to the inside of the
tube to provide minimum obstruction to flow.
Make sure that the upper and the lower ends are
oriented properly as the tubes are assembled.
(Parting lines should roughly be lined up.)

Figure 21

1.

Drill the holes here

28. Slide the lower end of the tube assembly over the

blower outlet and align the notch with the tube
latch. Latch the tube to the blower.

29. Install the removable weights. Hook the front toe

board weights assembly over the top of the weight
mounting plate and secure with two hairpins (see
Figure 22).

Weight Quantities

Deck
Size

48 inch

52 inch

60 inch

72 inch

Toe
Board
Weight

3

2

2

1

Caster
Weight

2

2

Note: The removable weights are heavy. Use
care when lifting them. Make sure that you can
hold them securely before lifting them. Use
caution when positioning your hands so that you
Do Not set them down on your hands or fingers.

17