Termination, Installation into an existing chimney, Termination installation into an existing chimney – Enviro EG40 BV User Manual

Page 7: Initial installation

Advertising
background image

Initial Installation

QUALIFIED INSTALLERS ONLY

T

ERMINATION

:

7

� �� ���� ���

�������

������ ����� ����

������� ������ ����

������������

� �� ���� ���

�������

�� �� ����� ���

Figure 3: Height of Vertical Termination.

The bottom of the vent cap shall extend at

least 2 feet (0.61 m) above the highest point

of the roof where it passes through and at

least 2 feet (0.61 m) higher than any portion

of the roof within a horizontal distance of 10

feet (3.1 m).
See vent manufacturer’s instructions for vent

system clearances to combustibles and vent

terminal clearance from roof.

I

NSTALLATION

I

NTO

A

N

E

XISTING

C

HIMNEY

:

Figure 4: Installation into an existing chimney.

This basic venting configuration shown are rough guidelines only.

Follow national and local codes for other installation options.
Measure the height of the chimney beforehand and purchase

the appropriate kit. Never attempt to over stretch a flexible liner

to accommodate the height of the chimney.
• Any flue damper must be removed or locked permanently in

the open position.
• The chimney must be clean, in good working order and

constructed out of non-combustible materials.
• Make sure that all chimney clean-outs are tightly fitting and will

not permit air to leak into the chimney.
• Make all gas connections and check for leaks.

See vent manufacturer’s instructions for vent system clearances

to combustibles and vent terminal clearance from roof.