Installation, Tarting, Thernet – Edimax Technology ES-5224RM EN User Manual

Page 16: Igabit, Anaged, Witch, 1-1. hardware and cable installation, User manual

Advertising
background image

User Manual

Publication date: July, 2006
Revision A2

10

2. Installation

2-1. Starting 24 Fast Ethernet + 2 Gigabit L2 Managed Switch Up

This section will give users a quick start for:

-

Hardware and Cable Installation

- Management Station Installation

- Software booting and configuration

2-1-1. Hardware and Cable Installation

At the beginning, please do first:

⇒ Wear a grounding device to avoid the damage from electrostatic discharge

Installing Optional SFP/GBIC Fiber Transceivers to the L2 Managed Switch

Note: If you have no modules, please skip this section.


Connecting the SFP/GBIC Module to the Chassis:

The optional SFP/GBIC modules are hot swappable, so you can plug or unplug
it before or after powering on.

1. Verify that the SFP/GBIC module is the right model and conforms to the
chassis

2. Slide the module along the slot. Also be sure that the module is properly

seated against the slot socket/connector

3. Install the media cable for network connection

4. Repeat the above steps, as needed, for each module to be installed into

slot(s)

5. Have the power ON after the above procedures are done

Fig. 2-1 Installation of Optional SFP/GBIC Fiber Transceiver

Advertising
This manual is related to the following products: