3.2. PREPARATION AND UNPACK ING

Suite, Club and NIMA stoves are delivered in two packages:

The first contains the stove

The second contains the ceramic cladding. (Fig. 2)


The Musa stove is only delivered in one set of packaging composed of:

The first pack contains the stove

The second pack contains the sides made of steel (fig.1).

The Toba stove is delivered in two ways depending on its front panel,

both ceramic or steatite.
In the case of a ceramic front panel there will be one sole package with

the structure (the box with the ceramic panel shall come flanked with

that containing the structure and the top) while in the case of a steatite

front panel the package shall be formed of two pallets, one with the

structure and the top and the other made in steatite.
The Sagar stove is delivered in one sole package formed of:

The first containing the stove with the box holding the steel

sides to its side

One contains the ceramics or steatite for the top (fig.2/2a). In

this case there will be a single pack for the structure (the

cardboard with the ceramics will be placed above the packaging

with the structure)


Open the packaging, remove, for the Suite/ Club/Sagar/Toba/Nima,

stoves, the two brackets that block the stove on the pallet (one on the

right and one on the left side-fig.3/4), while for the Musa (fig.5) stove

remove the screws directly from the base of the stove.
Position the stove in the chosen place, paying attention that it meets

the instructions above.



Figure 1 – Example of stove packaging

Figure 3 - Removing the packaging screws

(in figure Suite stove)

Figure 2 - Example of packing for

ceramics

Figure 2a – Soapstone package example

(Toba Oven)