MCZ Vivo 80 Pellet HYDRO User Manual

Page 68

Advertising
background image

66

10-MAINTENANCE AND CLEANING

END-OF-SEASON SHUTDOWN

At the end of each season, before switching the product off, it is recommended to remove all the pellets from the hopper with a vacuum

cleaner that has a long pipe.

The product must be disconnected from the mains when it is not used.

CHECKING THE INTERNAL COMPONENTS

ATTENTION!

The internal electromechanical components must only be checked by qualified personnel whose technical expertise

includes combustion and electricity.

It is recommended to perform this routine maintenance annually (with a scheduled service contract), which focuses on a visual and

functional verification of the internal components. The following is a summary of the necessary checks and/or maintenance for the

product to work correctly.

PARTS/INTERVAL

1 DAY

2-3 DAYS 7 DAYS

30 DAYS

60-90 DAYS

1 YEAR

Brazier

·

Ash pan

·

Glass

·

Lower compartment

·

Complete exchanger

·

Smoke duct

·

Door gasket

·

Internal parts

·

Product

·

Circulation pump

·

Plate heat exchanger

·

Plumbing components

·

Electromechanical components

·

Advertising