Assembly of goya cladding, Goya cladding components – MCZ Goya User Manual

Page 6

Advertising
background image

INSTALLATION AND USE MANUAL

Chapter 3

GOYA

page

6

Chapter 3

Technical service – all rights reserved by mcz spa

Reproduction prohibited

3. ASSEMBLY OF GOYA CLADDING

3.1. GOYA CLADDING COMPONENTS

COMPONENTE

CORNICE GOYA

N.

1

VITERIA IN DOTAZIONE

ANCORA A FARFALLA

4

N.

1


N.B. The Goya cladding required periodic maintenance (about every 12 months) to preserve its

characteristic finish over time. Remember that rust is a natural phenomenon that will progress if

not dealt with. Therefore it is advisable to treat the concerned surfaces (not the black-painted

steel parts) with a protective wax that arrests and stabilizes the oxidation process.

Advertising