Quickguide blower door – Retrotec Blower Door with DM-2 User Manual

Page 4

Advertising
background image

□

Perform a Blower Door test on the building and

record the EqLA at 50 Pa.

□

Install cardboard in upper part of doorway with a

20 x 20 inch hole cut in it.

□

Perform a second Blower Door test on the

building, record the EqLA at 50 Pa.

□

Subtract the first result from the second result

and the value should be 400 sq. in. (+/-10%).

QuickGuide Blower Door

Speed control is handled automatically with FanTestic
software, for complete automation.

Control Fan speed with software

Field system check monthly

Alternatively, use a Verification Plate in an optional

double hole Door Panel, or use the optional Flex Duct

with a 400 sq. in. hole in a plate on the end.

Page 4 of 4

Check gauge operation and check for blocked, leaking

or pinched tubes weekly, and anytime results are in

question.

To perform the gauge check, you will need the gauge

and Umbilical.

□

Press [Exit] [Time Average] until “4s” appears.

□

Press [Mode] repeatedly to display “PrB”.

□

Connect the yellow tube between the red and

yellow ports.

□

Repeat between different ports with each of the

tubes you use for testing.

Field check gauge weekly

If readings on “PrA” and “PrB” are within 2% and

don’t drop rapidly, the tube is not blocked or

leaking and the gauge is correct.

Checking your gauge

and tubes regularly will

eliminate a common

source of error in

readings.

Advertising