INSPECTION

As soon as a unit is received, it should be inspected for possible dam-

age during transit. If damage is evident, the extent of the damage

should be noted on the carrier’s delivery receipt. A separate request for

inspection by the carrier’s agent should be made in writing. See Local

Distributor for more information.

Requirements For Installing/Servicing R-410A Equipment

• Gauge sets, hoses, refrigerant containers, and recovery system

must be designed to handle POE oils, and the higher pressures

of R-410A.

• Manifold sets should be 800 PSIG high side and 250 PSIG low

side with 550 PSIG low side restart.

• All hoses must have a 700 PSIG service pressure rating.

• Leak detectors should be designed to detect HFC refrigerant.

• Recovery equipment (including refrigerant recovery containers)

must be specifically designed to handle R-410A.

• Do not use an R-22 TXV.

• A liquid-line filter drier is required on every unit.

LIMITATIONS

The unit should be installed in accordance with all National, State and

Local Safety Codes and the limitations listed below:
1. Limitations for the indoor unit, coil and appropriate accessories must

also be observed.

2. The outdoor unit must not be installed with any duct work in the air

stream. The outdoor fan is the propeller type and is not designed to

operate against any additional external static pressure.

3. The maximum and minimum conditions for operation must be

observed to assure a system that will give maximum performance

with minimum service.

4. This unit is not designed to operate with a low ambient kit. Do not

modify the control system to operate with any kind of low ambient

kit.

5. The maximum allowable line length for this product is 75 feet.

SECTION III: UNIT INSTALLATION

LOCATION

Before starting the installation, select and check the suitability of the

location for both the indoor and outdoor unit. Observe all limitations and

clearance requirements.
The outdoor unit must have sufficient clearance for air entrance to the

condenser coil, for air discharge and for service access. See Figure 1.

If the unit is to be installed on a hot sun exposed roof or a black-topped

ground area, the unit should be raised sufficiently above the roof or

ground to avoid taking the accumulated layer of hot air into the outdoor

unit.
Provide an adequate structural support.

ADD-ON REPLACEMENT/RETROFIT

When this unit is being used as a replacement for an R-22 unit, it is

required that the outdoor unit, indoor coil, and metering device all be

replaced. The following steps should be performed in order to insure

proper system operation and performance. Line-set change out is also

recommended.
1. Change-out of the indoor coil to an approved R-410A coil/ condens-

ing unit combination with the appropriate metering device.

2. Change-out of the line-set when replacing an R-22 unit with an

R410-A unit is highly recommended to reduce cross-contamination

of oils and refrigerants.

3. If change-out of the line set is not practical, then the following pre-

cautions should be taken.

• Inspect the line set for kinks, sharp bends, or other restrictions,

and for corrosion.

• Determine if there are any low spots which might be serving as

oil traps.

• Flush the line set with a commercially available flush kit to

remove as much of the existing oil and contaminants as possi-

ble.

• Install a suction line filter-drier to trap any remaining contami-

nants, and remove after 50 hours of operation.

4. If the outdoor unit is being replaced due to a compressor burnout,

then installation of a 100% activated alumina suction-line filter drier

in the suction-line is required, in addition to the factory installed liq-

uid-line drier. Operate the system for 10 hours. Monitor the suction

drier pressure drop. If the pressure drop exceeds 3 psig, replace

both the suction-line and liquid-line driers. After a total of 10 hours

run time where the suction-line pressure drop has not exceeded 3

psig, replace the liquid line drier, and remove the suction-line drier.

Never leave a suction-line drier in the system longer than 50 hours

of run time.

Air Temperature DB

at Outdoor Coil, °F

Air Temperature DB

at Indoor Coil, °F

Min.

Max.

Min.

Max.

Cool

Heat

Cool

Heat

WB

Cool

DB

Heat

WB

Cool

DB

Heat

50

-10

115

75

57

50

1

1. Operation below this temperature is permissible for a short period of

time, during morning warm-up.

72

80

For multiple unit installations, units must be spaced a minimum of 24
inches apart. (Coil face to coil face.)

NOTICE

FIGURE 1: Typical Installation with Required Clearances

THERMOSTAT

NEC CLASS 1

WIRING

TO INDOOR
BLOWER

NEC CLASS 2
WIRING

TO COIL

WEATHERPROOF

DISCONNECT

SWITCH

24” SERVICE

ACCESS

CLEARANCE

NOTE: ALL OUTDOOR WIRING MUST BE WEATHERPROOF

SEAL OPENINGS WITH
PERMAGUM OR EQUIVALENT

60” OVERHEAD
CLEARANCE

10” CLEARANCE
AROUND PERIMETER