Section 2 - installation, 1 unpacking and inspection, 2 terminations – KEPCO MAT Full Rack MAT 6V, 15V, 25V AND 36V MODELS User Manual
Page 18

MAT 6V/15V/25V/36V/ 022300
2-1
SECTION 2 - INSTALLATION
2.1
UNPACKING AND INSPECTION
This instrument has been thoroughly inspected and tested prior to packing and is ready for
operation. After careful unpacking, inspect for shipping damage before attempting to operate.
Perform the preliminary operational check as outlined in PAR 2.8 If any indication of damage is
found, file an immediate claim with the responsible transport service.
2.2
TERMINATIONS
1.
Internal Controls Accessible through top cover: Refer to Table 2-1 and Figure 3-2.
2.
Front Panel: Refer to Figure 2-1 and Table 2-2.
3.
Rear Panel: Refer to Figures 2-2 and Table 2-3.
Table lists Input/Output connectors for the MAT Power Module
TABLE 2-1. INTERNAL CONTROLS ACCESSIBLE THROUGH TOP COVER
REFERENCE
DESIGNATION
CONTROL
PURPOSE
A1R28
I
O ZERO
(NOTE 1)
Used to adjust output current of power supply to initial value.
CONDITIONS: current mode, shunt at the output.
A1R20
E
O ZERO
(NOTE 1)
Used to adjust output voltage of power supply to zero.
CONDITIONS: voltage mode, no load.
A1R15
I
CURRENT SENSING
ZERO
(NOTE 1)
Used to adjust current monitor amplifier to zero.
CONDITIONS: voltage mode, no load.
A1R16
I
FULL SCALE CURRENT ADJUST
(NOTE 1)
Used to calibrate the full scale value of the output current.
CONDITIONS: current mode, shunt at the output.
A1R11
V
REF
(NOTE 1)
Used to calibrate full scale voltage.
CONDITIONS: voltage mode, no load.
A1R12
I
REF
(NOTE 1)
Used to adjust internal full scale current.
CONDITIONS: current mode, shunt at the output.
A3S1
Node Address
Used to select Node address (node number or channel number) of the MAT
Power Supply from 1 - 31
A1TP1
Test Points
Provides four test points used for testing/calibration
1 -CURRENT REFERENCE
2 -CURRENT MONITOR
3 - VOLTAGE REFERENCE
4 - COMMON
NOTES:
1. These adjustments must be done in accordance with the calibration procedure (see PAR. 5.5).