Installing gas supply, 5. installing gas supply – Hobart Welding Products TM-944C User Manual

Page 10

Advertising
background image

TM-944 Page 8

Handler 135 / 175

Return To Table Of Contents

3-5.

Installing Gas Supply

Obtain gas cylinder and chain to
running gear, wall, or other
stationary support so cylinder
cannot fall and break off valve.

1

Cap

2

Cylinder Valve

Remove cap, stand to side of valve,
and open valve slightly. Gas flow
blows dust and dirt from valve.
Close valve.

3

Cylinder

4

Regulator/Flowmeter

Install so face is vertical.

5

Regulator/Flowmeter Gas
Hose Connection

6

Welding Power Source Gas
Hose Connection

Connect customer supplied gas
hose between regulator/flowmeter
gas hose connection, and fitting on
rear of welding power source.

7

Flow Adjust

Typical flow rate is 20 cfh (cubic
feet per hour). Check wire
manufacturer’s recommended flow
rate.

Tools Needed:

Ref. 802 028-A / 802 441

5/8, 1-1/8 in

6

1

2

3

Argon Gas Or

Mixed Gas

4

5

7

.

DO NOT use Argon/Mixed gas regulator/flowmeter
with CO

2

shielding gas. See Parts List for optional

CO

2

gas regulator/flowmeter.

Advertising