Hearth and Home Technologies Quadra-Fire 43ST-ACC User Manual

Page 36

Advertising
background image

Page 6

7037-135E

September 1, 2008

R

4300 Wood Stove Series (ACC)

F. Tube Channel Assembly Replacement

Removing Tube Channel Assembly
1. Remove the right side shield by removing 2 screws in the

back using a Phillips head screw driver.

2. Remove 4 screws from channel access cover and remove

cover.

. Locate 2 channel nuts inside of chamber and remove

using a 7/16 socket wrench. Slide out tube channel

assembly.

NOTE: Soak the bolts with penetrating oil for at least 15 min-

utes before trying to remove them.

Replacing Tube Channel Assembly
1. Silde one gasket on each tube first.
2. Slide the tube channel assembly into side of firebox and

insert each tube into the corresponding hole in the tube

channel rack starting with the back hole first.

. Make sure tube channel assembly is flush against the

side of the stove and secure with channel nuts.

4. Re-install channel cover and side shield.

Channel

Access

Cover

Channel

Nuts (2)

Side Panel

Tube Channel

Assembly

Channel Cover

Screws (4)

Tube Channel Rack

Remove

2 Screws

Slide one gasket

over each tube

Figure 36.1

NOTE: Service Space

In order to replace the tube channel assembly a clearance

of 19 inches (48mm) is required on the right side of stove

in order to remove the tubes with the stove in place.
If space is not available, the stove will have to be discon-

nected from the chimney to proceed with the tube replace-

ment.

Advertising
This manual is related to the following products: