Fbwc module and capacitor pack option – HP DL980 G7 User Manual
Page 68

Hardware options installation 68
The SPI board is not shown for clarity.
9.
Install the access panel.
10.
Slide the server back into the rack.
11.
FBWC module and capacitor pack option
CAUTION:
Do not use this controller with cache modules designed for other controller models,
because the controller can malfunction and you can lose data. Also, do not transfer this cache
module to a different controller module, because you can lose data.
To install the component:
1.
Back up all data.
2.
Close all applications.
3.
Power down the server (on page
CAUTION:
In systems that use external data storage, be sure that the server is the first unit to be
powered down and the last to be powered back up. Taking this precaution ensures that the system
does not erroneously mark the drives as failed when the server is powered up.
4.
Extend the server from the rack (on page
5.
Remove the access panel (on page
6.
Remove the SPI board.