Maintenance schedule, Maintenance – Husqvarna 16 H User Manual

Page 18

Advertising
background image

16

– English

50

100

MAINTENANCE

25

!

WARNING!

No service procedures must be conducted on the engine or cutting unit unless:

The engine is switched off.

The ignition key is removed.

The ignition cable is removed from the plug.

The parking brake is applied.

The cutting unit is disengaged.

Maintenance schedule

The following is a list of the maintenance which should be conducted on the machine. For the items which
are not described in these instructions go to an authorised service workshop.

Check the engine’s oil level

18

Check the engine’s cooling air inlet

18

Check the fuel pump’s air filter

18

Check the steering wires

19

Check the battery

20

Check the safety system

20

Check screws and nuts

Check for fuel and oil leakage

Clean the air filter’s pre-filter (foam plastic)

2)

21

Check the cutting unit

23

Check the tyre pressures (60 kPa)

30

Change the engine oil

1)

32

Check the V-belts

Check the hydrostat’s cooling fins

Check the transmission’s oil level

20

Adjust the brakes

19

Lubricate joints and shafts

3)

30

Check and adjust the throttle wire

33

Clean the engine’s and hydrostat’s cooling flanges

2,4)

Replace the air filter’s pre-filter and paper filter

2)

21

Replace the fuel filter

33

Replace the plug

1)

First change after 5 hours.

2)

During dusty conditions cleaning and replacement should be more frequent.

3)

For daily use of the

machine lubrication should be conducted twice a week.

4)

Conducted by authorised service workshop.

Daily

mainte-

nance

before start

= Described in these instructions.

= Not described in these instructions.

Maintenance

Page

Maintenance interval

in hours

Advertising