Sequence of cutting operation, 5. sequence of cutting operation – Hobart Welding Products AIRFORCE 625 User Manual

Page 23

Advertising
background image

.

A complete Parts List is available at www.HobartWelders.com

OM-926 Page 19

out bottom of cut.

801 400-B

5-5. Sequence Of Cutting Operation

After cutting arc starts, slowly

start moving torch across metal.

Adjust torch speed so

sparks go thru metal and

Pause briefly at end of

cut before releasing trigger.

Raise trigger lock and press

trigger. Pilot arc starts.

Postflow continues for approx. 20 seconds

after releasing trigger; cutting arc can be

instantly restarted during postflow by raising

trigger lock and pressing trigger.

The pilot arc starts immediately
when trigger is pressed.

For standard (shielded) cutting, place drag

shield on edge of metal. For extended

(non-shielded) cutting, use 1/8 in (3.2 mm)

standoff distance (dragging tip will reduce tip

life).

Connect work clamp to a clean, paint-free

location on workpiece, as close to cutting

area as possible.

.

Set air pressure to 75 PSI (517 kPa) for cutting.

90

°

Advertising