Verify the switch passes self test, Verify the switch passes self test -6 – HP 2520G-POE User Manual

Page 26

Advertising
background image

2-6

Installing the Switch
Installation Procedures

2. Verify the Switch Passes Self Test

Before mounting the switch in its network location, you should first verify it
is working properly by plugging it into a power source and verifying it passes
its self test.

1.

For the Switch 2520G-24-PoE, connect the power cord supplied with the
switch to the power connector on the back of the switch, and then into a
properly grounded electrical outlet.

For the Switch 2520G-8-PoE, connect the AC/DC adapter’s power cord to
the power connector on the back of the switch, and then plug the AC/DC
power adapter into a nearby properly grounded electrical outlet.

Figure 2-1. Connecting the power cord

N o t e

The Switch 2520G-24-PoE does not have a power switch. It is powered on
when the power cord is connected to the switch and to a power source. For
safety, the power outlet should be located near the switch installation.

Connect power cord to

the power connector

Switch 2520G-8-PoE

Switch 2520G-24-PoE

Connect AC/DC power adapter to the

switch and an AC power outlet

Advertising