Assembly step – Horizon Fitness ELITE SERIES AFG T6 User Manual

Page 10

Advertising
background image

10

INTRODUCTION

IMPORT

ANT

PRECAUTIONS

ASSEMBL

Y

BEFORE

YOU
BEGIN

TREADMILL

OPERA

TION

LIMITED

W

ARRANTY

TROUBLESHOOTING

&

MAINTENANCE

CONDITIONING

GUIDELINES

A Open WHITE HARDWARE BAG.
B Slide HAND RAIL SLEEVE over

the top of the hand rail.

C Attach top of HAND RAIL to

the console extension using 2

SCREWS (G).

D Attach bottom of HAND RAIL to

the base frame using 1 BOLT

(H), 1 SPRING WASHER (I) and

1 WASHER (j).

E Slide HAND RAIL SLEEVE firmly

against console.

F Repeat on other side.

ASSEMBLY STEP 

SCREW (G)
15 mm

Qty: 4

BOLT (H)
30 mm

Qty: 2

WASHER (J)

8 mm DIAMETER
Qty: 2

SPRING WASHER (I)

8 mm DIAMETER
Qty: 2

WHITE HARDWARE BAG CONTENTS :

HAND RAIL

HAND RAIL SLEEVE

WASHER (J)

BOLT (H)

SPRING WASHER (I)

SCREW (G)

Advertising
This manual is related to the following products: