You’re finished, Assembly step 4 – Horizon Fitness ELITE SERIES AFG T6 User Manual
Page 11
Advertising
11
INTRODUCTION
IMPORT
ANT
PRECAUTIONS
ASSEMBL
Y
BEFORE YOU
BEGIN
TREADMILL OPERA
TION
CONDITIONING GUIDELINES
TROUBLESHOOTING &
MAINTENANCE
LIMITED WARRANTY
YOU’RE FINISHED!
A Open ORANGE HARDWARE BAG.
B Attach HAND RAIL BASE COVER to
the base frame using
2 SCREWS (K).
C Slide HAND RAIL TRANSITION
PIECE and HANDLEBAR into
CONSOLE.
C Repeat on other side.
D Be sure all bolts and screws are
tightened and secured on the
treadmill.
ASSEMBLY STEP 4
SCREW (K)
30 mm
Qty: 4
ORANGE HARDWARE BAG CONTENTS :
SCREW (K)
HAND RAIL BASE COVER
HAND RAIL TRANSITION PIECE
Advertising
This manual is related to the following products: