You’re finished, Assembly step 4 – Horizon Fitness ELITE SERIES AFG T6 User Manual

Page 11

Advertising
background image

11

INTRODUCTION

IMPORT

ANT

PRECAUTIONS

ASSEMBL

Y

BEFORE YOU

BEGIN

TREADMILL OPERA

TION

CONDITIONING GUIDELINES

TROUBLESHOOTING &

MAINTENANCE

LIMITED WARRANTY

YOU’RE FINISHED!

A Open ORANGE HARDWARE BAG.

B Attach HAND RAIL BASE COVER to

the base frame using

2 SCREWS (K).

C Slide HAND RAIL TRANSITION

PIECE and HANDLEBAR into

CONSOLE.

C Repeat on other side.

D Be sure all bolts and screws are

tightened and secured on the

treadmill.

ASSEMBLY STEP 4

SCREW (K)

30 mm

Qty: 4

ORANGE HARDWARE BAG CONTENTS :

SCREW (K)

HAND RAIL BASE COVER

HAND RAIL TRANSITION PIECE

Advertising
This manual is related to the following products: