Force10 Networks Force10 TeraScale E-Series E1200i User Manual

Page 43

Advertising
background image

Installing and Maintaining the E1200i System

43

Use the following steps to install a DC PEM:

Step

Task

1.

Make sure that the remote power source (the circuit breaker panel) is in the OFF position.

2.

Make sure that the over-current protector (located on the PEM front panel) is in the OFF position.

3.

Loosen the retaining screw and remove the PEM safety cover .

FN00103lp

S afety

cover

R etaining

s crew

Advertising