2.4.6 Connecting to the utility power supply

1000/1500VA:

Use a suitable power cord, and plug it into the input socket (see fig. 2.6)

2200/3000VA:

The UPS is equipped with a fixed input power cord.

1. Plug the input power cord into a working three wire, grounded AC wall outlet. Do not

use extension cords.

2. Turn on the input breaker (if the breaker can be turned on) on the rear panel of UPS.

After that, the fan (in rear panel) will run and, as a front panel test, all LEDs will light

up for about 2-3 seconds. The UPS starts up in ‘STAND-BY’ mode and the battery

will be charged. See fig 2.7.

Though the batteries (the internal energy reserve) were fully charged when the UPS left

the factory, they might have lost some energy during transport and/or storage. It is

recommended to allow the UPS to recharge the batteries for at least 6 hours. This way

you ensure that the UPS can provide sufficient runtime in case of a utility power failure.

2.4.7 Checking the site-wiring fault LED

When the UPS is still in ‘STAND-BY’ mode, check the site-wiring fault LED. If the UPS

is plugged into an improperly wired AC utility power outlet, this LED flashes as shown in

Fig 2.8.

The detection of site wiring faults includes a missing ground, phase-neutral polarity

reversal and an overloaded neutral circuit. If the LED lights up, unplug the UPS and

have the site wiring checked by a qualified electrician.

This step completes the installation procedure.