Digital energy, Gt series, 4 recycling the ups at the end of service life – GE Industrial Solutions Digital Energy GT Series 1-3kVA - Rack Mount User Manual

Page 19

Advertising
background image

OPM_GTU_19X_1K0_3K0_XUS_V014

18

GT-UL Series: User manual 1.2 (US)

Digital Energy

GT Series

g

6.3.2 Battery

replacement

procedure)

1.5kVA

1

Remove front panel

2

Unscrew two bolts of the

3

battery terminal cover and remove it

4 Unplug

battery

connectors

5

Unscrew five bolts of the

6 battery

compartment

cover

and remove it

7

Unscrew two bolts of

battery fixer and remove it

8 Pull out the battery set

and renew it

9 Assemble

UPS

by

reverse

procedure.

6.3.3 Battery

replacement

procedure)

3kVA

NOTE: The battery banks should be installed by service personnel.

1

Remove front panel

2

Unscrew two bolts of the battery compartment

3 Remove battery cover

4 Unscrew two bolts

5/6 Remove stop holder and battery terminal

7 Grasp the tag to pull out the battery sets.

Be

careful,

heavy

weight!

Notice not to let the battery set

to drop in accident

7 When you see the first warning label,

please

disconnect

all

leads

Continue horizontally pulling the battery set 1

until you see the next warning label (See fig. 6-4)

7a Now you can easily release battery set 1! (Gently lift it up!)

Put battery set 1 beside.

7b Continue pulling out battery set 2.

8 Unplug all connectors of batteries

9

Renew the batteries and re-install them with reverse procedure.

6.4 Recycling the UPS at the end of service life

GE Digital Energy, in compliance with environment protection recommends that the

UPS equipment, at the end of its service life, must be recycled conforming to the local

applicable regulations.