Digital energy, Gt series, 4 installation – GE Industrial Solutions Digital Energy GT Series 1-3kVA - Rack Mount User Manual

Page 8

Advertising
background image

OPM_GTU_19X_1K0_3K0_XUS_V014

7

GT-UL Series: User manual 1.2 (US)

Digital Energy

GT Series

g

2.4 Installation

The unit should be installed by service personnel.

IMPORTANT:

Before making any connection and switching on the UPS, please check the following

conditions:

• Mains supply is 100/110/120 Volts and 50/60Hz,

• Total power demand of the connected equipment does not exceed the rated output

power of the UPS (indicated on the rating label).

2.4.1 Mounting in a 19” enclosure

1. Install the mounting bracket. See fig. 2.2.

2. Adjust the rails and gently slide UPS into the rails. See fig. 2.3.

3. Fix mounting bracket on the enclosure by screws. See fig. 2.3.

2.4.2 Vertical

installation

The UPS is rack mountable as well as

standing alone. You can mount the UPS

on the shelf, or you can erect the UPS

with supporting stands (not included in

delivery) as shown in fig 2.4.

1

2

3

Fig 2.2 Installing the mounting brackets

Fig 2.3 Mounting the UPS

Fig 2.4 Vertical installation

Supporting stands
(not included)

Advertising