SCR Module Replacement (Sizes M, Z,

and N)

This procedure requires the following tools and

materials:

• #2 Philips-head screwdriver,

3

/

16

"

Allen wrench,

torque wrench

• Scotchbrite or equivalent abrasive
• Mild solvent to clean mounting surfaces
• Electrolube 2GX or equivalent thermal grease

1. Loosen the screws holding the MOVs and bus bars

to the SCR Module to be replaced, shown in Figure

14, and remove the MOVs and bus bars.

2. Remove the mounting screws at each end of the SCR

Module, then lift out the Module. Retain all parts

and hardware removed from the SCR Module for

reassembly with the replacement Module.

3. Clean the heat sink surface of the replacement

Module with a fine abrasive, such as Scotchbrite.

Remove all particles from the heat sink surface and

wipe the SCR mounting surface with a mild solvent.

Apply a light coat of thermal grease, such as

Electrolube 2GX to both the SCR and heat sink

surfaces.

4. Place the contact face of the SCR Module on the

mating heat sink surface. Move the Module back

and forth several times to distribute the thermal

grease evenly over the contact surfaces.

5. Attach the SCR Module to the heat sink with the

screws removed earlier. Tighten the screws to 44 in-

lb.

6. Reattach the bus bars and MOVs to the SCR Module

with the screws removed earlier. Tighten the screws

to 80 in-lb.

Figure 14. Location of SCRs on size M, Z, N ASTAT-IBP.

Advertising