Astat, Ibp plus service instructions – GE Industrial Solutions ASTAT-IBP Plus Solid State Starters User Manual

Page 14

Advertising
background image

ASTAT

®

-IBP Plus Service Instructions

10

Prices and data subject to change without notice.

7. Lift out the SCR Module, as shown in Figure 21.

Retain all parts and hardware for reassembly with

the replacement Module.

8. Remove the threaded stud from the SCR Module

and attach it to the new Module. Tighten to 200 in-

lb torque.

9. Clean the heat sink surface of the replacement

Module with a fine abrasive, such as Scotchbrite.

Remove all particles from the heat sink surface and

wipe the SCR mounting surface with a mild solvent.

Apply a light coat of thermal grease, such as

Electrolube 2GX to both the SCR and heat sink

surfaces.

10. Place the new SCR Module in the proper position on

the mounting surface. Move the Module back and

forth several times to evenly distribute the grease on

the plate.

11. Secure the SCR Module to the mounting plate with

the screws removed earlier. Tighten the screws to 44

in-lb torque.

12. Reattach the load-side lug, L-shaped busbar, and

CT, if applicable. Tighten the mounting bolts to 200

in-lb torque.

13. Reattach the busbars to the SCR Module. Tighten

the mounting bolts to 150 in-lb torque.

14. Attach the wiring harness of the new SCR Module to

its mating piece. Attach the harness of the CTs, if

necessary.

Figure 21. Removing the SCR Module from the mounting plate..

Advertising
This manual is related to the following products: