Preparing to install the refrigerator, Installation refrigerator instructions, Important – GE 23 User Manual

Page 23

Advertising
background image

BEFORE YOU BEGIN

Read these instructions completely
and carefully.

IMPORTANT

Save these instructions

for local inspector’s use.

IMPORTANT

Observe all governing

codes and ordinances.

• Note to Installer – Be sure to leave these

instructions with the Consumer.

• Note to Consumer – Keep these instructions

for future reference.

• Skill level – Installation of this appliance requires

basic mechanical skills.

• Completion time – Refrigerator Installation

30 minutes

Water Line Installation
30 minutes

Proper installation is the responsibility of

the installer.

Product failure due to improper installation is not

covered under the Warranty.

If the refrigerator has already been installed,
remove the base grille (see Step 2 in Moving
the Refrigerator
), then skip to Step 5 in Installing
the Refrigerator
.

Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: ge.com

In Canada, call 1.800.561.3344 or Visit our Website at: GEAppliances.ca

Installation

Refrigerator

Instructions

Models 23, 25, 26, 27 and 29

If the refrigerator has an icemaker, it will have
to be connected to a cold water line. A GE water
supply kit (containing tubing, shut-off valve, fittings
and instructions) is available at extra cost from your
dealer, by visiting our Website at ge.com (in Canada
at GEAppliances.ca) or from Parts and Accessories,
800.626.2002 (in Canada 1.888.261.3055).

PREPARATION

WATER SUPPLY TO THE ICEMAKER

TOOLS YOU WILL NEED

23

Phillips-Head Screwdriver

3/8″ and 5/16″ Socket

1/2″ and 7/16″ Wrench

Plastic Putty Knife

1/8″ Hex Wrench

Advertising