Installation instructions – GE 23 User Manual

Page 31

Advertising
background image

31

Installation Instructions

REPLACE THE BASE GRILLE

Replace the grille by installing the two Phillips-
head screws.

7

SET THE CONTROLS

Set the controls to the recommended setting.

8

START THE ICEMAKER

Set the icemaker power switch to the ON
position. The icemaker will not begin to operate
until it reaches its operating temperature
of 15°F (–9°C) or below. It will then begin
operation automatically. It will take 2–3 days
to fill the ice bin.

9

Power
Switch

Advertising