Cabinetry, Combined advantium and wall oven installation – GE ZET2 User Manual

Page 9

Advertising
background image

9

NOTE: The middle rail separating the two
openings may need to be larger than the 2

(5.1 cm) minimum shown. Always refer to the
individual installation instructions packed with
each product for specific requirements.

Combined Advantium and Wall
Oven Installation:

When installed in combination with a
Monogram single wall oven, use separate
electrical junction boxes.
• Refer to the Advantium oven installation

instructions for electrical requirements of
that product.

• These connections must be made

by a qualified electrician. All electrical
connections must meet National Electrical
Code or prevailing local codes.

NOTE: Additional clearances may be
required. Check to be sure the oven
supports above the Warming Drawer
do not obstruct the required interior 23 1/2

(59.7 cm) depth and 9 1/4

(23.5 cm) height.

The middle rail separating the openings
may need to be larger than the 2

(5.1 cm)

minimum shown. Always refer to the
individual installation instructions packed
with each product for specific requirements.

Warming Drawer
Combined with Advantium
and Single Oven:

Install a separate 120V, 60Hz, properly
grounded receptacle. See installation
Instructions packed with each product
for specific requirements.

Note: Install the
oven only with
specific models
listed on the label
located on top of
the oven.

Cabinetry

Single Oven Cutout
for Installation Below
a Monogram Advantium
Oven

A7

Single Oven Cutout
for Installation Between
a Monogram Advantium
Oven and a Monogram
Warming Drawer

A8

23 1/2

(59.7 cm)

Min.

Inside

2

(5.1 cm) Min.

45 1/4

(114.9 cm)

27 5/16

(69.2 cm)
Max.

2

(5.1 cm) Min.

45 1/4

(114.9 cm)

1

(2.5 cm) Min.

Above Toekick

23 1/2

(59.7 cm)

Min.

Inside

2

(5.1 cm) Min.

9 1/4

(23.5 cm)

27 5/16

(69.2 cm)
Max.

28 1/2

(72.4 cm)

Per Advantium
Requirement

28 1/2

(72.4 cm)

Per Advantium
Requirement

Advertising