BUILD AND INSTALL THE ZONELINE

BASE PLATFORM

1. Construct a 23

1

4

” min. x 23

1

4

” min. square platform with legs to

raise the platform a minimum of 8”.

NOTE: The platform must have a load-bearing capacity of

175 lbs. minimum.

1

Installation Instructions

18

WALL PLENUM AND ARCHITECTURAL LOUVER INSTALLATION

• Install the appropriate wall plenum through the exterior wall in accordance with the Installation Instructions provided

with the plenum.

IMPORTANT:

The wall plenum is not designed to carry structural loads.

Proper wall header construction is required. The plenum requires proper flashing,

shim and caulk for a weather resistant installation.

Properly square

and level plenum.

Proper header for

structural support.

Apply proper caulking

and flashing.

Architectural

Louver—RAVAL1

Exterior/Outside Wall

Case

Wall Plenum

RAVWP6 – 6

D x 19

3

4

W x 32

H

RAVWP8 – 8

D x 19

3

4

W x 32

H

RAVWP12 – 12

D x 19

3

4

W x 32

H

RAVWP15 – 15

D x 19

3

4

W x 32

H

2. Make drain hole cutout(s):

• Primary Drain – Centerline of drain is

approximately 5

1

4

” from left platform edge

and 8

1

2

” from back platform edge.

• Secondary Drain – Centerline of drain

is approximately 6

1

2

” from left platform edge

and 5

1

4

” from back platform edge.

3. Place the platform in the utility closet

with the following clearance between it

and the interior surface of the walls/door/panel:

• 4” min. from front of the case –

Unit to be installed through FRONT of case

• 5” min. from front of the case –

Unit to be installed through SIDE of case

• 3” min. from two sides of the case (5” for side

installation).

4. Align the platform with the opening of

the wall plenum and secure to the floor

using appropriate brackets and bolts.

23

1

4

min.

8”min.

for

drain

access

Cutout for drain

connection(s)

(see NOTE below)

Back of platform

Left side of platform

NOTE: Specific cutout size

for drain connections needs

to be determined by the installer

for the given installation situation.

5

1

4

23

1

4

min.

5

1

4

6

1

2

8

1

2

Advertising
This manual is related to the following products: