Scheduled maintenance, Check the tire pressure – Genie Z-34 User Manual

Page 15

Advertising
background image

Part No. 56011

Genie Z-34/22 Bi-Energy

13

Operator's Manual

First Edition • Fifth Printing

Scheduled Maintenance

Maintenance performed quarterly, annually and
every two years must be completed by a person
trained and qualified to perform maintenance on this
machine according to the procedures found in the
service manual for this machine.

Machines that have been out of service for more
than three months must receive the quarterly
inspection before they are put back into service.

Check the Tire Pressure

This procedure does not need
to be performed on machines
equipped with the foam-filled
tire option.

Bodily injury hazard. An over-
inflated tire can explode and may
cause death or serious injury.

Tip-over hazard. Do not use
temporary flat tire repair products.

To safeguard maximum stability, achieve
optimum machine handling and minimize tire
wear, it is essential to maintain proper pressure
in all air-filled tires.

1 Check each tire with an air pressure gauge and

add air as needed.

Tire specifications

Industrial tire

9-14.5 LT

100 psi (6.89 bar)

Rough terrain tire

10-16.5 NHS

45 psi (3.1 bar)

MAINTENANCE

Advertising
This manual is related to the following products: