Installation instructions, Step 1 construct ceiling support continued – GE Island Vent Hood ZV421 ZV541 User Manual

Page 12

Advertising
background image

12

STEP 1 CONSTRUCT CEILING SUPPORT

CONTINUED

Installation Instructions

Ductwork
• Use the shortest and straightest duct route possible.

For satisfactory performance, duct run should not
exceed 150 feet equivalent length for any duct
configuration.

• Refer to “Duct Fittings” chart to compute the maximum

permissible length for duct runs to the outdoors.

• This vent hood must use 10” round rigid duct.
• Install the house ductwork to run horizontally between

ceiling joists or straight up through the roof.

Finish the Ceiling
• Finish the ceiling surface. Be sure to mark location of

the ceiling joists and cross framing. Check to be sure
the ceiling is level, use shims if necessary.

Ceiling

Joist

17"

(54" Hood)

12-3/4"

(42" Hood)

2x 4 Min.

Cross Framing

Height

Adjustment

Screw Holes

8-5/8"

Ceiling Joint

2x4

10"

Duct

Vent Straight Up

Through The Ceiling

• Secure each 2 x 4 block with at least four (4), #10 wood

screws, 3” long (not supplied). Use 8 wood screws
total for the two supports.

The cross framing must be accurately aligned to

assure correct positioning of the hood.

• The cross framing must be level in all directions.

Check with a spirit level and adjust if necessary.

IMPORTANT: The ceiling structure must be capable of
supporting the weight of the hood (approximately 300
pounds) and any inadvertent user contact loads. The
hood support frame will be supported by the 2 x 4
cross framing.

Advertising