Step 4, install support frame and duct covers, Installation instructions, Caution – GE Island Vent Hood ZV421 ZV541 User Manual

Page 14: Prudence

Advertising
background image

14

Installation Instructions

STEP 4 INSTALL ACCESSORY (OR SUPPLIED) SUPPORT AND DUCT COV-
ERS

Install supplied support frame OR telescoping
accessory frame

• Hang the supplied support frame or telescoping

accessory frame to the ceiling joists and cross framing
on the 4 hex head screws by engaging the keyhole slots
on the frame.

• Check to be sure the support frame is level, vertically

and horizontally.

• Tighten the hex head screws securely.
• Install safety screws, (Screws E) on each side of the

frame.

Adjust telescoping accessory frame to length
• Remove the 8 frame adjustment screws. Adjust the

lower support up or down to the pre-determined length.
Reinstall and securely tighten the 8 adjustment screws.

• Slide the top (inner) accessory duct cover up and over

the frame. Secure the duct cover to the frame as shown
using Screws D.

• Locate and remove the safety stop screw. Slide bottom

duct cover up and over the top duct cover. Align bottom
duct screw hole to the hole in the frame. Hold the duct
cover in place while installing screw.

CAUTION:

The stop screw

must be installed. Failure to do so could result in
personal injury or damage to the duct cover. The stop
screw will prevent the lower duct from sliding down
while completing the installation.

PRUDENCE

Il faut mettre en place la vis de butée afin d’éviter des
blessures ou d’endommager l’enceinte du conduit. La vis
de butée empêche l’enceinte inférieure du conduit de
descendre pendant l’installation.

Secure house wiring
• Route house wiring through the ceiling and pull a length

to reach the hood junction box, approximately 6” below
the support. Tape to the right side of the support frame.

IMPORTANT: Again, check to be sure the support is
level in both directions. There is no way to level the hood
after the hood is secured to the frame.

Install

Safety Screw

on Each Side

Adjust

Frame to

Installation

Height

Install Small Pan Head

Screws on Each Side

Top Duct

Cover

Bottom Duct

Cover

Install Stop

Screw

Stop Screw

Storage Location

Screws E

Screws D

Advertising