Parts, hardware, accessory packages, Installation preparation, Parts provided – GE Island Vent Hood ZV421 ZV541 User Manual

Page 9: Hardware package, Accessory package

Advertising
background image

9

Installation Preparation

PARTS PROVIDED

Locate the parts packed with the hood.

HARDWARE PACKAGE

Locate and check
contents. Screws
shown actual size.

2 Grease trays (3 with 54" hood)

Implement rods with standoffs

Duct collar

Support frame for 8 ft. ceiling
with 4 large pan head screws
installed on the bottom corners.

2-piece decorative duct cover

Transition with Damper

Decorative top cover

2 Filters (3 with 54" hood)

ACCESSORY PACKAGE

Check accessory package.
Select the taller set for 9’6 to 10’4" ceilings.
Select the shorter set for 8’6" to 9’6" ceilings.
Discard unused set.

Advertising