5. INSTALLATION AND STARTING

5.1. H

ANDLING

The filters are delivered on a wooden tray and can easily be moved with the help of a forklift.
They can also be handled with the help of the lifting rings.

5.2. E

LECTRICAL CONNECTIONS

The electrical connections must be done with no voltage by a qualified electrician.

N

L1

L2

L3

N

L1

CleanWave

®

Fig.

7

‘Upstream’

terminals

‘Downstream’

terminals

To

mains

L2

L3

To

distorting

load

D1 Breaker

Earth

PE

4

1

2

3

5

6

7

8

The power connections (see fig. 1 et 2) are done on the upstream (3) and downstream (4)
terminals.

For IP21 CleanWave

®

filters (see fig. 3), access to the terminals is possible either by removing,

without voltage, the top panel (13), or the lower part of the front panel (16). The cables can be
entered either from the bottom of the cabinet or through one of the side panels (17).