4 event scheduling – Microsoft CP-D31N User Manual

Page 37

Advertising
background image

37

3. Network Functions

3.4 Event Scheduling

The scheduling function enables to setup scheduled events including power on /
power off. It enables to be “self-management” projector.

• You can schedule the following control events: Power ON/OFF, Input

Source, Transferred Image Display and Transferred Text Display.
• The power on event has the lowest priority among the all events that are
defined at the same time.
• There are 3 types of Scheduling, 1) daily 2) weekly 3) specific date. (

22)

• The priority for scheduled events is as follows 1) specific date 2) weekly
3) daily.
• Up to five specific dates are available for scheduled events. Priority is given to
those with the lower numbers when more than one event has been scheduled
for the same date and time (e.g., ‘Specific date No. 1’ has priority over ‘Specific
date No. 2’ and so on.
• The "PJMessenger/Projector Messenger Tool", which is an application
software for Messenger function, has a function that gives priority to and
displays one of the stored text data into the projector. While such a high-priority
text data is displayed, the other text data that is scheduled for display on the
same time are not displayed. (

42)

• Be sure to set the date and time before enabling scheduled events. (

24)

NOTE

Advertising