Installation and user manual, Step 4 arrival of mge field engineer – MGE UPS Systems STS 600A User Manual

Page 15

Advertising
background image

Installation and User Manual

Figure QS-4 400/600A STS Input/Output Power Connections.

Step 4 Arrival of MGE Field Engineer

The MGE Field Engineer will finalize the initial Epsilon STS™ start-up. To insure a successful installation and
reliable STS service, the MGE Field Engineer will verify all of the installation connections, fusing, and then will
examine the extensive set of Epsilon STS™ personalization parameters to insure that the operation of the STS
exactly matches your installation requirements.

Quick start

QS —5

86-504004-00 B03

CONTROL WIRES
THREADED THROUGH
UNIT

CONTROL WIRE

PANDUIT/WIRE-WAYS

TOP ENTRY
CONDUIT PLATE

BRACE AT
12" INTERVALS

BOTTOM ENTRY
CONDUIT PAN

COMMUNICATION

CARDS

TB1

TERMINAL

CONTROL WIRES

CONTROL WIRE

PANDUIT/WIRE-WAYS