Table 4

Meter-Timing Gas

(Time required for one revolution is charted for various size
meter dials and various rates of gas input in cu. ft. per hour. To
convert to Btuh, multiply by the heating value of the gas used.)

Figure 10
Dials of Typical Gas Meter

(B) Pressure Method

The pressure method determines input by measuring the
pressure of the gas in the manifold in inches of water.

1.

Determine correct manifold pressure from Table 5.

2.

Remove access panel (see Figure 11a) and locate
combination gas control.

3.

Move gas control knob (or lever) to off.

4.

Remove the 1/8" pipe plug in outlet pressure tap in
combination gas control (see Figure 11b) and attach water
manometer or “U” tube which is at least 12" high.

5.

Follow lighting instructions and turn thermostat up to get
unit to fire.

6.

If pressure as indicated by “U” tube is less than 1/2" higher
or lower than indicated in TAble 5, adjust regulator as
described under “meter-Timing method,” Step 3.

If pressure as indicated by “U” tube is more than 1/2"
higher or lower than indicated in Table 5, check inlet
pressure at unit. The inlet pressure should be 6"-7" W.C.
pressure on natural gas and 11"-14" W.C. on propane gas.

After adjustment move gas control knob (or level) to off and
replace 1/8" pipe plug. With plug in place move knob (or leave)
to on.) Replace the access panel, making use a good tight seal
is achieved around the entire perimeter of the access panel.

VENTING

LABEL

POWER EXHAUSTER

PRESSURE

SWITCH

JUNCTION

BOX

FAN GUARD

FAN MOTOR

SIGHT GLASS

GAS SUPPLY

CONNECTION

(Not Shown)

ACCESS PANEL

COMBUSTION AIR

INLET COLLAR

LIGHTING

INSTRUCTION &

RATING PLATE

12

CHECKING INPUT RATE

Figure 11b

COMBINATION
GAS CONTROL

PRESSURE REGULATOR
ADJUSTMENT SCREW
(UNDER CAP SCREW)

MANIFOLD
PRESSURE TAP

PILOT
TUBING

IGNITION
CONTROL

IGNITION
CABLE

MAIN BURNER

MANIFOLD

Time for 1

Input, Cu. Ft. per Hour, When Meter Dial Size is:

Revolution,

Sec.

1/2 cu. ft.

1 cu. ft.

2 cu. ft.

5 cu. ft.

10

180

360

720

1800

12

150

300

600

1500

14

129

257

514

1286

16

112

225

450

1125

18

100

200

400

1000

20

90

180

360

900

22

82

164

327

818

24

75

150

300

750

26

69

138

277

692

28

64

129

257

643

30

60

120

240

600

35

51

103

206

514

40

45

90

180

450

45

40

80

160

400

50

36

72

144

360

55

33

65

131

327

60

30

60

120

300

70

26

51

103

257

80

22

45

90

225

90

20

40

80

200

100

18

36

72

180

120

15

30

60

150

Figure 11a

CAUTION

Check the gas inlet pressure at the unit upstream of the
combination gas control. The inlet pressure should be 6"-7"
W.C. on natural gas or 11"-14" W.C. on propane. If inlet pressure
is too high, install and additional pressure regulator upstream of
the combination gas control.
Important —Inlet pressure and manifold pressure must be
checked with unit in operation when making final adjustments.