Ldvr series direct vent gas fireplace, Below grade installations – Majestic Appliances LDVR1 User Manual

Page 18

Advertising
background image

18

LDVR Series Direct Vent Gas Fireplace

10007317

STEP 6
Guide the vent termination’s 4” (102 mm) and 7” (178
mm) collars into their respective vent pipes. Double
check that the vent pipes overlap the collars by 2” (51
mm). Secure the termination to the wall with screws pro-
vided and caulk around the wall plate to weatherproof.
(Fig. 30)
STEP 7
Support the horizontal pipes every 36” (914 mm) with
metal pipe straps. Make sure that the horizontal vent
pipe is installed on a level horizontal plane.
STEP 8
Re-check the fireplace to make sure that it is levelled,
properly positioned, and nailed or screwed to the floor.
If applied, the fireplaces adjustable frame drywall strips
(nailing flanges) should be fastened. Refer to “Framing
& Finishing”.

CFM137

Rear Vent length

2/26/01 sta

X

High

Temperature Sealant

CFM137

Fig. 29 Apply high temperature sealant.

CFM138

4", 7" collar

2/26/01 sta

X

X

CFM138

Fig. 30 Horizontal length requirement.

CFM136

Rear Vent horizontal length

2/26/01 sta

X

Always install hori-
zontal venting on a
level plane.

CFM136

Fig. 28 Measure horizontal length including 2” overlap.

Below Grade Installations

When it is not possible to meet the required vent ter-
minal clearances of 12” (305 mm) above grade level
a snorkel vent kit #7TDVSNORK is required. It allows
installation depth of down to 7” (178 mm) below grade
level. The 7” is measured from the center of the hori-
zontal vent pipe as it penetrates through the wall.

If venting system is installed below
ground, we recommend a window well with
adequate and proper drainage.
Ensure sidewall venting clearances are ob-
served.
The maximum horizontal run with 24”
vertical rise is 36” (914 mm) from the
back of the fireplace to the face of the
exterior wall. See vent graph (Page 12) for
extended horizontal run if the vertical rise
exceeds 24” (610 mm).

1. Establish vent hole through the wall. (Fig. 25)
2. Remove soil to a depth of approximately 16”

(406mm) below base of snorkel. Install window
well (not supplied). Refill hole with 12” (305 mm) of
coarse gravel leaving a clearance of approximately
4” (102 mm) below snorkel. (Fig. 31)

3. Install vent system. See Page 13, Steps 2 through 5.
4. Ensure a watertight seal is made around the vent

pipe coming through the wall.

5. Apply high temperature sealant caulking (supplied)

around the 4” and 7” snorkel collars.

6. Slide into the vent pipe and secure to the wall.
7. Level the soil to maintain a 4” (102 mm) clearance

below snorkel. (Fig. 31)

Advertising