Connections, Input/output allocation tables – Mercury PR0091 User Manual

Page 4

Advertising
background image

Mercury 6-5 Stat – Installation & User Guide


Connections

All connections are made to the back of the controller. The diagram below shows the connection detail. Inputs
and outputs are assigned according to the chosen configuration. See

Specification

for further details on

connections.

























!

Do not connect an earth.



Input/Output Allocation Tables

An over-ride can be achieved by switching in a fixed value resistor in parallel with the probe inputs as shown
in the table below.

5 Ch Thermostat

Description

Alarm Action

(Switched Resistor)*

Input 1

Probe 1 and Over-ride 1

Yes

Over-ride signal 1

Input 2

Probe 2 and Over-ride 2

Yes

Over-ride signal 2

Input 3

Probe 3 and Over-ride 3

Yes

Over-ride signal 3

Input 4

Probe 4 and Over-ride 4

Yes

Over-ride signal 4

Input 5

Probe 5 and Over-ride 5

Yes

Over-ride signal 5

Relay 1

Thermostat Channel 1

N/A

Relay 2

Thermostat Channel 2

N/A

Relay 3

Thermostat Channel 3

N/A

Relay 4

Thermostat Channel 4

N/A

Relay 5

Thermostat Channel 5

N/A


* For PT1000 probes use 820 Ohm

Ensure that all power is

For NTC2000 and NTC2k25 probes use 590 Ohm



switched off before
installing or maintaining
this product

Revision 1.2

Page 4 of 21

Advertising