Mr. Heater MHVFB10LP User Manual

Page 6

Advertising
background image

6

Installation Instructions and Owner’s Manual

Unvented LP-Gas Fired Buddy Wall-Mount Heater

ping. Remove mounting bracket from back panel.

Figure 5

Removing Front Panel of Heater

1. Remove three screws on bottom front of front

panel.

2. Pull bottom of front panel forward, then down

(see figure 6)

Figure 6

Attaching Mounting Bracket to Wall

Use holes on each end of mounting bracket to attach

bracket to wall. These holes are 16 inches apart. At-

tach mounting bracket to wall in one of two following

ways.

1. Attach to wall studs
2. Attach to wall anchor

Attaching to Wall Stud:

This way is the best providing the strongest mounting in

wood frame houses.

Attaching to Wall Anchor:

This way allows you to attach mounting bracket to hol-

low walls (wall areas between studs) or to solid walls

(concrete or masonry).
Decide which way best suits your needs. Either method

will provide a secure hold for the mounting bracket.

1. Tape mounting bracket to wall where heater

will be located. Make sure mounting bracket is

level. For wall stud mounting locate one end of

the mounting bracket over a wall stud.
WARNING: Maintain minimum clearances

shown in figure 7. If you can, provide greater

clearances from the floor and joining wall.

2. Mark screw locations on wall (see figure 7).
3. Remove tape and mount bracket from wall.

Figure 7

Attaching to Wall Stud:

For attaching mounting bracket to wall studs

1. Drill holes at marked locations using 9/64” drill bit.
2. Place mounting bracket onto wall. Line up

holes on each end of bracket with hole drilled in

wall.

3. Insert mounting screws through bracket and

into wall studs.

4. Tighten screws until mounting bracket is firmly

fastened to wall studs.

Attaching to Wall using Anchor:

For attaching mounting bracket to hollow walls (wall ar-

eas between studs) or solid walls (concrete or masonry)

Note: Wall anchors, mounting screws, and spacer

are in hardware package. The hardware package

is provided with heater.
1. Drill holes at marked locations using 5/16” drill

bit. For solid walls (concrete or masonry), drill

at least 1” deep.

2. Fold wall anchor as shown in figure 8 below.

Figure 8.

3. Insert wall anchor (wings first) into hole. Tap

anchor flush to wall.

4. For thin walls (1/2” or less) insert red key into

wall anchor.

5. Place mounting bracket onto wall. Line up

holes on each end of bracket with wall anchors.

6. Insert mounting screws through bracket and

into wall anchors.

7. Tighten screws until mounting bracket is firmly

fastened to wall.

Mounting

Bracket

Adjoining W

all

17-1/2” Min.

6-1/2” Min. 10,000 BTU

12-9/64” (Sm)

Mark mounting hole locations

and drill holes where indicated.

Allow for minimum clearances

Advertising