Checking input rate, Heater parts from acf greenhouses, Figure 10 dials of typical gas meter – Modine Manufacturing BAE User Manual

Page 11: Table 3 meter-timing gas

Advertising
background image

10
12
14
16
18
20
22
24
26
28
30
35
40
45
50
55
60
70
80
90

100
120

180
150
129
112
100

90
82
75
69
64
60
51
45
40
36
33
30
26
22
20
18
15

360
300
257
225
200
180
164
150
138
129
120
103

90
80
72
65
60
51
45
40
36
30

720
600
514
450
400
360
327
300
277
257
240
206
180
160
144
131
120
103

90
80
72
60

1800
1500
1286
1125
1000

900
818
750
692
643
600
514
450
400
360
327
300
257
225
200
180
150

11

CHECKING INPUT RATE

Figure 9

Table 5
Orifice Drill Sizes with Decimal Equivalents

Dia.

Dia.

Drill

Decimal

Drill

Decimal

Size

Equivalent

Size

Equivalent

20

.1610

37

.1040

22

.1570

39

.0995

23

.1540

40

.0980

25

.1495

42

.0935

26

.1470

43

.0890

27

.1440

45

.0820

28

.1405

52

.0635

30

.1285

Main Burner Orifices

Table 4
Manifold Pressure & Gas Consumption *

Figure 10
Dials of Typical Gas Meter

Natural

Propane

BTU/Cu. Ft.

1050

2500

No. of

Model

Specific Gravity

0.60

1.53

Orifices

Manifold Pressure In. W.C.

3.5

10.0

CFH

28.6

12.0

Gal/Hr. Propane

.33

PAE 30

Sec/cu. ft.

126

300

1

Orifice Drill Size

37

52

CFH

47.6

20.0

PAE 50

Gal/Hr. Propane

.55

BAE 50

Sec/cu. ft.

76

180

1

Orifice Drill Size

30

45

CFH

71.4

30.0

PAE 75

Gal/Hr. Propane

.82

BAE 75

Sec/cu. ft.

50

120

1

Orifice Drill Size

20

37

CFH

95.2

40.0

PAE 100

Gal/Hr. Propane

1.15

BAE 100

Sec/cu. ft.

38

90

2

Orifice Drill Size

30

45

CFH

119.0

50.0

PAE 125

Gal/Hr. Propane

1.43

BAE 125

Sec/cu. ft.

30

72

2

Orifice Drill Size

25

42

CFH

138.1

58.0

PAE 145

Gal/Hr. Propane

1.64

BAE 145

Sec/cu. ft.

26

62

3

Orifice Drill Size

30

45

CFH

166.7

70.0

PAE 175

Gal/Hr. Propane

1.86

BAE 175

Sec/cu. ft.

22

51

3

Orifice Drill Size

27

43

CFH

190.5

80.0

PAE 200

Gal/Hr. Propane

2.19

BAE 200

Sec/cu. ft.

19

45

3

Orifice Drill Size

23

40

CFH

214.3

90.0

PAE 225

Gal/Hr. Propane

2.46

BAE 225

Sec/cu. ft.

17

40

4

Orifice Drill Size

28

43

CFH

238.1

100.0

PAE 250

Gal/Hr. Propane

2.74

BAE 250

Sec/cu. ft.

15

36

4

Orifice Drill Size

25

42

CFH

285.7

120.0

PAE 300

Gal/Hr. Propane

3.29

BAE 300

Sec/cu. ft.

13

30

5

Orifice Drill Size

26

43

CFH

333.3

140.0

PAE 350

Gal/Hr. Propane

3.84

BAE 350

Sec/cu. ft.

11

26

5

Orifice Drill Size

22

39

CFH

381.0

160.0

PAE 400

Gal/Hr. Propane

4.38

BAE 400

Sec/cu. ft.

9

23

6

Orifice Drill Size

23

40

Table 3
Meter-Timing Gas

(Time required for one revolution is charted for various size
meter dials and various rates of gas input in cu. ft. per hour. To
convert to Btuh, multiply by the heating value of the gas used.)

Time for 1

Revolution,

Sec.

1/2 cu. ft.

1 cu. ft.

2 cu. ft.

5 cu. ft.

Input, Cu. Ft. per Hour, When Meter Dial Size is:

*Above gases based on average standards. Units can be furnished
for gases of different values and specific gravities. (Gal./Hr. based
on 60°F. 30" Hg., 91,500 BTU/Gal.) In Canada, refer to rating plate
on side of unit for orifices at high altitude.

“U” TUBE
MANOMETER

LIGHTING
INSTRUCTION &
RATING PLATE

GAS
DESIGNATION
PLATE

PILOT TUBING

OUTLET
PRESSURE TAP

COMBINATION
GAS CONTROL

CONTROL
TRANSFORMER

FAN MOTOR

JUNCTION BOX

FAN GUARD

ECO (ON UNITS
SO EQUIPPED.
SEE NOTE 5 ON
PAGE 16.)

Pilot Orifice Identity Numbers

Pilot Burner

Identity No.

Identity No.

Manufacturer

Natural Gas

Propane Gas

Honeywell

HCR-18 or BCR-18

HBR or BBR-12 or 11

Robertshaw

Johnson

7715

4710

1

8

N

1

O

P

L

As number appears on top of pilot orifice.

Heater Parts from ACF Greenhouses

Advertising
This manual is related to the following products:

PAE