Transition/electrostatic tower assembly – MartinLogan E2 User Manual

Page 10

Advertising
background image

10 Assembly

Note: The following instructions describe the assembly of

the right channel high-and mid-frequency tower. Duplicate

all assembly instructions for the left tower assembly.

1

Attach the outside (semi-circle shaped) trim rail to the

transition tower by aligning the five pins on the trim

rail with the 5 cam holes in the tower.

2

Use a phillips head screwdriver to rotate the cams a little

over 180° counter clockwise once the pin is properly

aligned in the cam. The arrow on the cam must be in

the position shown to accept the pin.

3

Make sure the trim rail is flush with the tower edge.

Transition/Electrostatic Tower Assembly

Figure 15

Figure 16

Figure 17

Advertising