Monessen Hearth BUF400 User Manual

Page 14

Advertising
background image

14

61D1013

OPTIONAL EqUIPMENT

FORCED AIR KIT (FA2A)

If you are installing the forced air kit, Model FA2A, see the installation instructions provided with the kit for electri-
cal wiring requirements, or the blower installation section. The firebox must be connected to main power supply
at time of firebox installation. The blower must be installed prior to the installation of the vent-free heater. The
electrical connections must be made before the firebox is framed and enclosed in the finished walls.

Electrical connections should only be performed by a qualified, licensed electrician,
main power must be off when connecting to main electrical power supply or performing
service.
The blower when installed, must be electrically grounded in accordance with local codes
or in the absence of local codes, with the National Electrical Code ANSI/NFPA 70.

W

ARNING

Advertising
This manual is related to the following products: