5.2 Start-up

• Check the main power voltage selection switch for proper supply voltage (230V /

115V)

• Check the control connections and verify they are correctly installed

Beware of Electrical Voltages!

• Switch on the main power supply to the drive.

• Start the calibration run (see section below).

• Check and test all functions to be used.

• If required, re-adjust door-specific parameters (opening and closing speeds,

braking distance, etc.) using the SERsoft programming software.

• Test the complete system.

6 Check List for Functional Tests

During the functional tests the door travel path must be free of obstructions. The only
limits to door travel should be the two end-stops. Test the unit according to the
following steps:

TEST 1:

POWER-UP

ACTION:

Energize the main power to the ATD 50 Actuator

®

EXPECTED BEHAVIOR:

No door movement.
Green LED on the Control Board illuminates.
Door is freely moveable.
No errors displayed on LED’ at terminals D5 - D9 (if
installed).
No errors displayed in the SERsoft Diagnostic Display.

TEST 2:

CALIBRATION RUN

ACTION:

Apply momentary or maintained contact between OPEN
input (A2) and Ground (A1).

EXPECTED BEHAVIOR:

Door moves slowly to open position and pushes against
end-stop.
Open position is now set in the microprocessor.

ACTION:

Apply momentary or maintained contact of CLOSE input
(A7) and Ground (A1).

EXPECTED BEHAVIOR:

Door moves slowly to closed position and pushes

against end-stop.
Closed position is now set in the microprocessor.