Table 15: Site Preparation Checklist (continued)

Date

Performed By

For More Information

Item or Task

“Rack Requirements for EX2200
Switches” on page 39

“Cabinet Requirements for EX2200
Switches” on page 40

Verify that your rack or cabinet meets the
minimum requirements for the installation of
the switch.

“Clearance Requirements for Airflow
and Hardware Maintenance for
EX2200 Switches” on page 42

Plan rack or cabinet location, including required
space clearances.

Secure the rack or cabinet to the floor and
building structure.

Wall

“Requirements for Mounting an
EX2200 Switch on a Desktop or Wall”
on page 42

Verify that the wall meets the minimum
requirements for the installation of the switch.

“Clearance Requirements for Airflow
and Hardware Maintenance for
EX2200 Switches” on page 42

Verify that there is appropriate clearance in your
selected location.

Cables

Acquire cables and connectors:

Determine the number of cables needed
based on your planned configuration.

Review the maximum distance allowed for
each cable. Choose the length of cable based
on the distance between the hardware
components being connected.

Plan the cable routing and management.

Related

Documentation

General Safety Guidelines and Warnings for EX Series Switches on page 113

General Site Guidelines for EX Series Switches on page 35

Installing and Connecting an EX2200 Switch on page 51

Mounting an EX2200 Switch on page 53