J-dream ii owner's manual, Back wall – Jacuzzi J-DREAM II User Manual

Page 22

Advertising
background image

20

J-Dream II Owner's Manual

Use cable ties to attach the CD/Radio wire bundle to the cascade hose. The hoses from valves 1 and 3 and the steam
hose are loosely attached to their mounting brackets to allow the slack when connecting them and when the hinged seat
wall is swung open (like a door) to access equipment. After they have been connected and there is sufficient slack, the
cable ties may be tightened. Feed the hot and cold water, valve manifold supply, valve 6 and 7 lines from the equipment
side wall and connect as below. Route the water filter line and control cable to the equipment side wall.

Back Wall

Control Cable

To Cascade Fitting

Hot Water Supply
(with braided metal
sheathing)

To Cascade Tee

Steam Line (with
black insulation cover)

To Valve 1

To Valve 3

To Valve 6

To Valve 7

From Water Filters

Cold Water Supply
(with braided metal
sheathing)

To Jets

To Steam Head

To Manifold

CD/Radio Speaker
and Power Wires

Advertising