Chapter 4: site preparation, Chapter 4, Site preparation – Juniper Networks EX4200 User Manual

Page 107: Table 24: site preparation checklist

Advertising
background image

Chapter 4

Site Preparation

Site Preparation Checklist for EX3200 and EX4200 Switches on page 81

General Site Guidelines for EX Series Switches on page 83

Site Electrical Wiring Guidelines for EX Series Switches on page 83

Environmental Requirements and Specifications for EX Series
Switches on page 85

Site Preparation Checklist for EX3200 and EX4200 Switches

The checklist in Table 24 on page 81 summarizes the tasks you need to perform
when preparing a site for EX3200 or EX4200 switch installation.

Table 24: Site Preparation Checklist

Date

Performed By

For More Information

Item or Task

Environment

“Environmental Requirements and
Specifications for EX Series Switches”
on page 85

Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.

Power

Measure distance between external power
sources and switch installation site.

Locate sites for connection of system
grounding.

“Power Specifications for EX3200
and EX4200 Switches” on page 97

Calculate the power consumption and
requirements.

Hardware Configuration

“EX3200 and EX4200 Switches
Hardware Overview” on page 3

Choose the number and types of switches you
want to install.

Rack or Cabinet

Site Preparation Checklist for EX3200 and EX4200 Switches

81

Advertising
This manual is related to the following products: