Inspection checklist – SPX Cooling Technologies MARLEY CLASS 800 User Manual

Page 26

Advertising
background image

26

Inspection Checklist

Date Inspected

Inspected By

Owner

Location

Owner's Tower Designation
Tower Manufacturer

Model No.

Serial No.

Process Served by Tower

Operation:

Continuous

Intermittent

Seasonal

Design Conditions

GPM

HW

°F

CW

°F

WB

°F

Number of Fan Cells

Condition: 1—Good 2—Keep an eye on it 3—Needs immediate attention

1 2 3

Comments

Structure

Casing Material
Structural Material
Fan Deck Material
Stairway?

Material

Ladder?

Material

Handrails?

Material

Interior Walkway?

Material

Cold Water Basin Material

Water Distribution System

Distribution Basin Material
Inlet Pipe Material
Inlet Manifold Material
Flow Control Valves?

Size

"

Nozzles — Orifice Diameter

"

Heat Transfer System

Fill
Drift Eliminators
Louvers

Use this space to list specific items needing attention:

Advertising