Side views – State Industries ULTRA FORCE 101 User Manual

Page 10

Advertising
background image

10

9. Temperature-Pressure relief Valve discharge pipe - see T&P

Valve Discharge Pipe requirements: on page 16.

10. Lower Temperature Probe, 1 of 2 temperature probes. The

water heater’s control system monitors this probe to detect

water temperature in the lower portion of the storage tank.

11. Water inlet pipe - 1 1/2” NPT connection.
12. Water heater drain valve.
13. Supply gas line connection. See Gas Supply Systems on

page 14.

14. Low Gas Pressure switch, see description under beginning

on page 8. See Gas Pressure requirements and Table

3 on page 12.

15. Vent connection (exhaust elbow) - 3 inch PVC.
16. Condensate trap with 1/2 inch PVC drain connection. See Figure

9 on page 17 and Condensate Drain installation on page 38.

side Views

1. Cleanout access panel, covers water heater cleanout

opening.

2. CCb enclosure - see beginning on page 8 for description.
3. intake air connection - 3 inch PVC.
4. Water heater 24 Volt Gas Valve.
5. Combustion blower.
6. Water outlet pipe - 1 1/2” NPT connection.
7. Uim (user interface module). The Uim includes the display

circuit board, the control system’s LCD display and

operational buttons. Used to adjust various user settings and

view operational information. See Control System Operation

on page 44.

8. Temperature-Pressure relief Valve. See Temperature-

Pressure relief Valve on page 16.

1

2

2

3

4

5

6

7

8

9

10

11

12

LEFT SIDE

120,000 & 150,000 Btu/hr MODELS

RIGHT SIDE

199,000 & 250,000 Btu/hr MODELS

4

5

13

14

15

16

3

figure 5

Advertising
This manual is related to the following products: